Add to Cart
power transmission line electric pole power distribution pole
Specifications:
| Height | From 9 meter to 100 meter |
| Suit for | Electric Power Transmission and Distribution |
| Shape | Polygonal or Conical |
| Material | Normally Q345B/A572, Minimum Yield Strength ≥ 345 N/mm² Q235B/A36, Minimum Yield Strength ≥ 235 N/mm² As well as Hot rolled coil from ASTM A572 GR65, GR50, SS400 |
| Power Capacity | 10kV to 220kV |
| Tolerance of the dimension | According to client’s requirement. |
| Surface treatment | Hot dip galvanized Following ASTM A 123, or any other standard by client required. |
| Joint of Poles | Slip joint, flanged connected |
| Standard | ISO 9001:2008 |
| Length of per section | Within 14 meter once forming |
| Welding Standard | AWS (American Welding Society ) D 1.1 |
| Thickness | 1 mm to 36mm |
| Production Process | Raw material test → Cutting →bending →Welding (longitudinal ) →Dimension verify →Flange welding →Hole drilling →sample assemble → surface clean→ Galvanization or powder coating , painting →Recalibration →Packages |
| Packages | Packing with plastic paper or according to client’s request. |
Steel
Descripition of material:The material is in accordance with NF EN 10025
Standard and NF EN 10149 Standard,it has the following property.
-Yield Strength=355N/mm2
-Toughness remains the same under 20 degrees below zero.
-Galvanization is in accordance with NFA35503 Standard Class 1.

Galvanization
Standard:NFA91121
Average thickness of the galvanization:Not less than 86μm.
Installation
-Remove all the equipment on the pole during Assembly.
-Circle a sling around th epole shaft of each section.
-Fix the sling on top section to one pulley block.
-The sling on the bottom section is tightly fixed and fixed at the center of gravity.
-Make the steel pole vertical by tighten the sling of the top section.
-Fix the steel pole.
-Remove the sling.

More Photos